EPC23102 / EPC23103

Regulates, converts or monitors a circuit’s power supply.

Tutorial / documentation

Power supplies

Quick documentation & first test preparation

  1. Identify component EPC23102 and its package.
  2. Check input range, output voltage and maximum current.
  3. Use the external components and layout recommended by the manufacturer.
  4. Consult the application circuit in the linked documentation before testing.

EPC23102

GaN Half-Bridge Power-Stage with Integrated Gate-Drivers, 80 V, 35 A, EPC_QFN-13-3EP

  • GaN Half-Bridge Power-Stage with Integrated Gate-Drivers, 80 V, 35 A, EPC_QFN-13-3EP
  • Check input range, output voltage and maximum current.
  • Use the external components and layout recommended by the manufacturer.
  • The manufacturer’s pinout and absolute limits take precedence over this page.
Technical documentation

EPC23103

GaN Half-Bridge Power-Stage with Integrated Gate-Drivers, 80 V, 25 A, EPC_QFN-13-3EP

  • GaN Half-Bridge Power-Stage with Integrated Gate-Drivers, 80 V, 25 A, EPC_QFN-13-3EP
  • Check input range, output voltage and maximum current.
  • Use the external components and layout recommended by the manufacturer.
  • The manufacturer’s pinout and absolute limits take precedence over this page.
Technical documentation