TPS2412D / TPS2412PW

Regulates, converts or monitors a circuit’s power supply.

Tutorial / documentation

Power supplies

Quick documentation & first test preparation

  1. Identify component TPS2412D and its package.
  2. Check input range, output voltage and maximum current.
  3. Use the external components and layout recommended by the manufacturer.
  4. Consult the application circuit in the linked documentation before testing.

TPS2412D

N+1 and ORing Power Rail Controller, SOIC-8

  • N+1 and ORing Power Rail Controller, SOIC-8
  • Check input range, output voltage and maximum current.
  • Use the external components and layout recommended by the manufacturer.
  • The manufacturer’s pinout and absolute limits take precedence over this page.
Technical documentation

TPS2412PW

N+1 and ORing Power Rail Controller, TSSOP-8

  • N+1 and ORing Power Rail Controller, TSSOP-8
  • Check input range, output voltage and maximum current.
  • Use the external components and layout recommended by the manufacturer.
  • The manufacturer’s pinout and absolute limits take precedence over this page.
Technical documentation